Electrical passed!!! So Tuesday is framing. Please keep us lifted in prayer . . . so far it's working!

Spent the entire 14 hour day at the house tiling the tub surround and getting ready for the framing inspection, including fire-stopping all holes from one floor to another, and fixing the drywall where Rich fell through the ceiling . . . that was a MAJOR headache. Rich's wife isn't strong enough to hold a 4 x 6 sheet of sheetrock over her head for very long at all. Poor Rich. :o( It took us four tries, with ill fits each time, either with obstacles in the way affecting measurements, or something else. Ugh.

Another long day at Crestview awaits me tomorrow. My feet are killing me, but I can't come up with something to do sitting down. Feeling tired and worn out tonight, so it's brief.

Tomorrow's framing inspection (please God, let it pass!) and either tiling, mowing, painting, or something else I haven't even thought of yet.